TL;DR: For 2026 payments, Form 1099-NEC applies at $2,000 or more, not $600. Collect W-9s now, close your mileage log at both 72.5 cents and 76 cents per mile, and ask your CPA before buying equipment or a truck in December.

Start with the calls your phone already recorded

Wirewoman logs every call to a dashboard. Pull the December call log and count calls by week.

Look at which weeks had after-hours calls. Count which calls became booked jobs. Separate emergencies from quote requests. This is a number your own phone shows you. It is not a guess based on how busy December felt.

Use that number when you set January hours and pricing. If after-hours calls were concentrated in one week, that tells you something different from a steady stream across the whole month. If quote calls filled the calendar while emergency calls were rare, that belongs in your January planning too.

Do this before you reset your hourly rate, day rate, and call-out pricing. Your December call record gives you a direct operating number to compare with your 2026 job results.

Collect every subcontractor W-9 before January

Make a list of every subcontractor and 1099 helper you paid in 2026. Send a W-9 request now to anyone whose form is missing.

Chasing W-9s in January is harder. You may be back in the truck, answering new calls, handling year-end paperwork, and trying to reach people who are already working somewhere else. Get the legal name, address, and taxpayer identification information while you still have time to follow up.

Then total what you paid each person during 2026.

For tax years beginning after 2025, the federal reporting threshold for Form 1099-NEC is $2,000. It was $600 before that change. If a subcontractor or helper received $2,000 or more in nonemployee compensation for 2026, Box 1a is used for that amount.

The IRS instructions say Form 1099-NEC is due on or before January 31. The payee copy is due on the same date. January 31, 2027 is a Sunday, so the practical due date for 2026 payments is Monday, February 1, 2027.

That does not mean you should wait until February. Your job this week is to collect the W-9s, confirm the totals, and give the records to your CPA or whoever prepares the forms.

One more problem belongs on this list. If a helper really works like an employee, calling that person a 1099 helper does not fix the classification. Read the misclassification article for California electrical helpers before you hand the file to your CPA.

Close unpaid invoices while you can still reach the customer

Print or export a list of every open invoice. Put the customer name, invoice date, amount, job address, and last contact date in one place.

Send a final written notice before December 31. Keep a copy. State the amount due and what you want the customer to do next. Do not rely on a phone call that leaves no record.

Then decide which unpaid invoices should go to small claims. The decision belongs on your December list because January gives you a new workload and more opportunities for old balances to disappear from view. Use the small claims guide for unpaid electrical invoices for that decision.

Check the invoice itself before you send the final notice. Make sure it contains what California requires so the balance is collectible. The California electrician invoice checklist covers the required information.

This is also the time to identify invoices that need help from your CPA or attorney. Do not turn a disputed balance into a tax or legal decision by guessing at the answer yourself.

Finish completed jobs and ask about income timing

Review every job that is substantially completed but not yet billed.

If the work is done, finish the paperwork and send the invoice. Make sure job costs are recorded with the right job. That includes materials, labor, permits, and other costs already tied to the project.

The point is not to force a tax result on your own. The point is to give your CPA a clean list of completed work, billed work, open work, and costs that belong with each job.

Ask the CPA how income and job costs should be timed for your business. Give them the job list before the year closes, not after you have forgotten which December call used which material.

If you buy equipment or a truck in December because you want to claim it for 2026, ask your CPA whether it qualifies and what has to happen before December 31. Do not rely on the purchase date alone. Do not make the decision from a number you saw in a social media post.

Split the mileage log at June 30

Close out the mileage log before the year ends. Separate the miles driven from January 1 through June 30 from the miles driven from July 1 through December 31.

The IRS business standard mileage rate for 2026 is 72.5 cents per mile for January 1 through June 30. It is 76 cents per mile for July 1 through December 31. The mileage log must be split at June 30 because the two rates apply to different parts of the year.

Do not hand your CPA one annual mileage number with no date split. Give them the two mileage totals and the supporting log.

Use the 2026 electrician truck mileage article for the log details. The rate is not the hard part. The hard part is having a record that shows when and why the business miles were driven.

Check the dates that can stop a job or raise your cost

Look up your CSLB license expiration date on the CSLB site. Write it down with the rest of your December business dates.

Then check the renewal dates for your bond, general liability policy, and commercial auto policy. Do not assume the dates match your license. Check each record.

Put the dates on the calendar where you will see them. A renewal notice buried in email is not a system.

Review the workers compensation items separately. The California contractor workers comp 2028 deadline article covers the deadline issue. The workers comp rate increase article for California electrical shops covers the cost side.

Do not invent a renewal period or fee from memory. Confirm the date in the actual license, bond, or policy record.

Reset January pricing from 2026 job results

Pull the numbers from your completed 2026 jobs. Look at the service calls, hourly or day-rate work, and per-opening jobs separately.

Review your January service call minimum. Review your hourly or day rate. Review your per-opening prices. Compare those prices with what each job actually required, including the time spent driving, diagnosing, waiting for access, returning for parts, and finishing paperwork.

Use the what electricians charge guide and the electrical price per opening guide as references for the pricing review.

Do not change every price because one job went badly. Look at the full year of results. A price reset is a business decision based on your own jobs, your own calls, and the work your shop wants to accept in January.

Write down the new prices before January calls start. If your phone service books jobs from your calendar, update the prices and booking rules before the first January customer calls.

Count truck stock and record what you ate

Count the truck stock before the year closes. Write down what is still usable, what should be returned, and what is dead stock.

Look for breakers, fittings, wire, devices, and other material that stayed in the truck because nobody checked it. Separate stock you can use from stock that has become a problem.

Note the copper and breaker costs you absorbed this year. Do not invent a price number. Record what your shop actually paid and which jobs carried the cost.

Give the inventory notes to your CPA with the rest of the year-end records. Your CPA can tell you how the items should be handled for your books and tax return.

The immediate business task is simpler. Stop buying material you already have. Return what can be returned. Carry forward a list of what needs to be priced into future work.

Set holiday coverage before December 24

Decide who takes emergency calls from December 24 through January 1. Write down what counts as an emergency.

A dead outlet quote call can be booked for January. A sparking panel call needs a different response. The owner controls that distinction.

Wirewoman answers 24/7, books to the shop’s calendar, sends the job summary by SMS within 30 seconds, and routes urgent calls by the shop’s own escalation rules. Update those escalation rules before December 24.

Set the person on emergency duty. Set the backup. Decide which calls ring the emergency person and which calls go onto the January calendar. Put those rules in writing so the answer does not change with whoever happens to answer the phone.

This is not a staffing guess. It is a setting you control before the holiday schedule starts.

Put the CPA packet together by December 31

Create one year-end packet with the records you collected.

Include the subcontractor list, W-9 status, 2026 payment totals, open invoices, final notices, completed jobs, unbilled work, job costs, split mileage totals, license and policy dates, pricing notes, inventory count, and holiday coverage rules.

Mark every question for the CPA. The 1099 threshold and due date go on that list. So does the treatment of equipment or a truck bought in December. So does the timing of income and job costs.

This week, pull the call log, collect missing W-9s, list unpaid invoices, close the mileage log at June 30, check the CSLB and policy dates, count truck stock, and set holiday escalation rules. Send every dollar decision to your CPA before you act on it.